Target Water Temp
205°F (96°C)
Step-by-Step Extraction Phases
-
Phase 1: Valve Open Bloom (45s) — Start with Switch valve OPEN (or drain-through). Pour ~25% water for clean aromatic pre-wetting & percolation.
-
Phase 2: Valve Closed Full Steep (75s) — Close the Switch valve, pour remaining water gently to full target weight, and steep immersed for 75 seconds.
-
Phase 3: Release Valve & Drawdown (60s) — Flip Switch valve OPEN onto carafe for a sweet, clean paper-filtered drawdown.